For both Design-Build and Construction Management delivery methods, the start of Preconstruction Phase is Architectural Design and it’s a very exciting time for most building owners. They love the ideas, options, and decorating aspects for their building. And then, when drawings are done, the owner is eager to get to the other main event of Construction Phase. But there is so much more happening during Design than they know and a lot more to be done before this Preconstruction Phase, “Pre-Con”, is complete. This is also when the contractor gets organized to save the most time and money during construction.
So, what exactly happens during the entire Pre-Con that could make a difference to the cost or schedule?
It’s important to note projects completed by General Construction delivery method typically don’t allow the ability for constructability review or the adequate time to line up as many competitive bidders.
Final thought, Pre-Construction Phase is critical to project success, so construction can start without costly delays and building owners can get in the building sooner. Wolgast’s Pre-Construction tasks are systemized, so these key items are completed consistently and guided by our best practices developed over 70+ years. We have offices in Saginaw, Alpena, Grand Rapids, and Kalamazoo to provide commercial construction services, quickly, efficiently, and with the most value. Call 800-WOLGAST to meet about your construction plans.
Other blog titles that may interest you:
Sharing Budget Streamlines Pre-Construction
Ample Estimating Time Can Lower Price of Construction
Safety on Site - What It Can Mean for Your Construction Project