# The Inside Scoop on Construction Manager at Risk Delivery Method

![Construction Manager at Risk Delivery](https://www.wolgast.com/hs-fs/hubfs/SFI-Steel-Erection.jpg?width=400&name=SFI-Steel-Erection.jpg)

 2/24/2016

 

By hiring a Construction Manager at Risk (CMAR) you’re getting a construction consultant on your team who handles all aspects of your building from design through warranty for a guaranteed maximum price. The CMAR oversees your project and can even hire the architect on your behalf, working with them to see that your design goals are recognized within the allotted budget. Then they complete all the pre-construction activities and hire the contractors as if it were the CMAR’s own project. The CMAR oversees the construction of the building through completion and any warranty issues.

Typically, a CMAR is most suitable for large, complex projects that may include multiple buildings or a year plus duration to construct. Clients that use this method of construction will be able to focus on their business while the undertaking of building their substantial building is professionally managed by construction experts.

Below is a list of five discoveries you’ll learn from working with a CMAR:

- Constructability and application reviews will help mold your building design for efficiency, provide better opportunity for a reduction in change orders, likely reduce cost of construction activities, and save time on the schedule.
- Selection of prime contractors based on value rather than low bid will provide a better quality building with less rework and or possibility of lawsuits. This is another means to save on the budget and time.
- Your scope doesn’t have to be complete for construction to start. With the contractor being completely familiar with the project goals, site work and in some cases foundation work can start before the plans are complete.
- CMAR is not always the least expensive delivery method due to the complexity, more risk being transfered to the construction manager, and (in some instances) working with an incomplete scope of work. However, if it was easy you wouldn’t need their expertise to complete the project. You likely will still be saving money over alternative methods of construction because of complications that can arise otherwise.
- If they weren’t already, your CM is going to be overly diligent in monitoring the budget and schedule because if anything is out of line, it will go against their predetermined profit for the project.

Due to the nature of this construction delivery, it is ordinary for a relationship of trust to develop among the team. The CMAR will treat the project as their own and make decisions that will result in the best quality for the budget and schedule duration providing a superior building as a result. For more information regarding Wolgast’s CMAR service, please call us at 800-WOLGAST.

[![Inquire Here](https://no-cache.hubspot.com/cta/default/12780/2bebfd66-660b-47d7-bc87-7ecf8191516b.png)](https://cta-redirect.hubspot.com/cta/redirect/12780/2bebfd66-660b-47d7-bc87-7ecf8191516b)

### Recent Blog Posts

### Posts By Category

- [Auto Dealers (4)](https://www.wolgast.com/blog/topic/auto-dealers)
- [Construction Management (30)](https://www.wolgast.com/blog/topic/construction-management)
- [Construction Safety (3)](https://www.wolgast.com/blog/topic/construction-safety)
- [Dental Office Construction (23)](https://www.wolgast.com/blog/topic/dental-office-construction)
- [Design (12)](https://www.wolgast.com/blog/topic/design)
- [Design/Build (63)](https://www.wolgast.com/blog/topic/designbuild)
- [Development (1)](https://www.wolgast.com/blog/topic/development)
- [Energy Savings (12)](https://www.wolgast.com/blog/topic/energy-savings)
- [Financing Construction (24)](https://www.wolgast.com/blog/topic/financing-construction)
- [Good for Business (82)](https://www.wolgast.com/blog/topic/good-for-business)
- [Leaseback (4)](https://www.wolgast.com/blog/topic/leaseback)
- [Manufacturing Construction (9)](https://www.wolgast.com/blog/topic/manufacturing-construction)
- [Medical Office Construction (26)](https://www.wolgast.com/blog/topic/medical-office-construction)
- [Professional General Contractor (56)](https://www.wolgast.com/blog/topic/professional-general-contractor)
- [Remodel (14)](https://www.wolgast.com/blog/topic/remodel)
- [Restaurant Construction (9)](https://www.wolgast.com/blog/topic/restaurant-construction)
- [Restoration (8)](https://www.wolgast.com/blog/topic/restoration)
- [Retail (1)](https://www.wolgast.com/blog/topic/retail)
- [Risk Management (29)](https://www.wolgast.com/blog/topic/risk-management)
- [Safety on Site (7)](https://www.wolgast.com/blog/topic/safety-on-site)
- [Scheduling (19)](https://www.wolgast.com/blog/topic/scheduling)
- [Schools (25)](https://www.wolgast.com/blog/topic/schools)
- [the Wolgast Way (71)](https://www.wolgast.com/blog/topic/the-wolgast-way)

## Receive News and Updates:

[Read Our Blog](https://www.wolgast.com/blog) [Subscribe](https://www.wolgast.com/blog-subscription) 

![](https://px.ads.linkedin.com/collect/?pid=1544218&fmt=gif)