Skip to content

Wolgast Blog - Construction Trends, Tips and Information

Get commercial construction questions answered by a professional contractor sharing building trends, tips and information

Posts about Professional General Contractor (2)

How to Design an Office for Patient Centered Medical Home

Since the Patient Centered Medical Home (PCMH) is more of a management model or philosophy, you may not have considered the building design changes that may be necessary to make the conversion.  Below we discuss some of the elements that your PCMH office design should consider.

You Have Construction Service Options

Which construction delivery system is best for your project?


There are several unique and distinctive methods for providing construction solutions. As a business owner you have the luxury of selecting the most beneficial and appropriate delivery system for your type of project.

How Technology Updates Change Schools

School Districts are facing pressure to incorporate technology into their curriculum to compete with other institutions who have already adopted 21st Century and New Tech programs. However, miles of wiring, hardware, software, white boards, wireless projectors and hand held devices aren’t the only technological concerns of modern schools.

All Things Touchless Boosts Protections for Onsite Staff

Through the pandemic, business leaders have learned that the importance of making work spaces safer within a commercial, industrial or institutional building and still be functional for workers, students, patients, patrons, clients, or whoever else may cross the threshold. Now, winter is predicted to elevate the Covid-19 spread as people are spending more time indoors sharing air. Even though many Michigan businesses are still closed from the shutdown or limited because they have made it possible for their work force to force work from home, some industries can’t have their staff working from home, schools have been going between open and closed as they navigate the infection levels, and healthcare offices are still restricting their service and who can come in the building. As these entities plan for the long haul of whatever amount of time the virus is going to be inflicting us, the keys of working at the “office” are separation, clean air, and making more things “touchless” in the business space – AKA All Things Touchless.

Fire Resistant Building Elements for Business Owners

To prepare for Fire Prevention Week the beginning of October, we have compiled information about making a business structure more fire resistant.

Construction Training Program Available for Rewarding Careers

Associated Builders and Contractors (ABC) and their Greater Michigan Construction Academy (GMCA) further supports Michigan contractors with an additional training program for interested high school students.  First a little history, Wolgast was one of the founding contractors to bring the local ABC Chapter to the Saginaw Valley Area in 1977.  Six years later ABC started the Merit Shop Training Program, now known as the GMCA, to train construction workers on skilled trades. They started by provided training for a variety of construction workers.  Until recently, their traditional student has been the adult learner taking evening classes.  In 2011, ABC expanded from the Saginaw Valley Chapter to the Greater Michigan Chapter, and included a total of 23 Michigan counties.

What to Know before Hiring a Commercial Architect or Contractor

The Jack Miller Group was a former industry network for General Contractors across the United States.  In 1988, Mr. Miller had published a paper called, “Rules You Should Know before You Build Your Important Project”.   He started by stating that there are a few basic questions that business owners should ask themselves as they start to plan a construction project1:

Michigan Businesses Rely on Wolgast for Construction

For our 100th blog, I wanted to do a special feature about our roots and coverage of the great State of Michigan.  We have ties to resources and communities from unsalted coast to unsalted coast.  Even though we continue to add to our registrations and expertise within other states, we love the nuances of working within the regulations of Michigan, from scheduling to accommodate anticipated weather patterns to familiar earth types of the Mitten State. 

Knowing Long Lead Items Early Speeds up Construction Schedules

Certain building materials or products that have to be ordered, imported, and/or manufactured specifically for a building can take longer than the natural progression of a construction schedule.  These are considered Long Lead Items (LLIs).  They commonly occur with pre-engineered buildings, elevators, generators, mechanical equipment that is heavy enough to need a helicopter lift, electrical switch gear, fancy finishes, or imported products to name a few.

A Guide to Relocating Your Business When the Time Is Right

In “Five of the Best Reasons for a Commercial Renovation”, I discussed why you should remodel now if you plan to stay at your current location.  In this blog, I offer tips on relocating your business/practice because your current location or building is no longer feasible to use.  Note:  if you own your existing space, it’s best to consult with your real estate agent to discuss the options regarding selling/renting your building.

Recent Blog Posts