Posts about Design/Build (5)

The Benefit of Design Build Phase I Drawings

Preliminary plans, such as those provided in a Phase I of the Design-Build process, are the most efficient and economical means to determine the budget for your construction project.

While there has been a shift in the numbers1, there are still many business owners out there who are skeptical of the Design-Build method of construction.  They are more familiar with the traditional Design-Bid/Build method where they hire an architect, then have general contractors competitively bid the project, and the contractor with the best price/value builds the project.

Flexible Finish Substitutions Can Improve Construction Time & Budget

Architects and engineers are smart people who are dedicated to taking the information their clients provide them and designing an aesthetically pleasing and functional building to meet their client’s goals.  In their design specifications, they include specific products for building finishes, which they’ve researched or have experienced, to match the desired outcome expressed by their client.  Typically, these materials or products have also been discussed with and accepted by the client.

Michigan's Energy Code (2015) to Save Energy for Building Owners

The 2015 Michigan Energy Code, as directed by Licensing and Regulatory Affairs (LARA), went into effect Sept 20, 2017.  The changes to the code involve lighting controls of new commercial buildings and remodels with more than 50% lighting alterations in an effort to increase energy savings.  In a nutshell, different areas of a commercial building will need both sensors and a wall switch or dimmer to control lighting.

Construction Broker Service Compared to Professional Construction

As construction broker companies continue to pop up, they’re coming up short compared to a Design-Build – General Construction (DB-GC) Firm in many important areas for project success.  DB-GCs provide much more control over the schedule and the budget on your project versus a construction services broker.

Medical Office Design and Construction for Savvy Docs

For over 70 years, Wolgast has developed specialty design and construction services for Medical Practitioners and efficient use of their space.  We keep in mind the patient flow, staff flow, regulatory requirements, and design elements for comfort for all.  Please view the short video linked above that displays our experience and abilities to make your space great for everyone who uses it. 

How Much Will a Phase I Save Me on Architectural Costs?

 

Short answer is roughly 20% or more.  Through a number of cost saving opportunities, the Design/Build Phased Approach to construction can be the most economical cost- and time-wise, not only saving on Architectural services, but also on the overall construction budget.

Quick Turn over for Auto Dealership Reimage

The Ford Motor Company reimage program is in full effect.  Dealers had to be committed earlier this year and now have until the end of 2016 to complete their design.  We are experience with designing and constructing many flagship dealers and can do the same for you.

Rick Keith, Wolgast Corporation's Architect, is ready to assist dealerships however he can.  Rick has been through corporate design programs with other dealerships, hotel chains, and restaurants, so he knows the protocol involved.

Why Winter Is the Best Time to Plan Your Construction Project

Other than taking time to prepare a plan when the weather is poor for construction (so you can be ready when the weather is conducive for construction) there are additional benefits to contact your design/builder or general contractor in the winter.  Let me clarify that the following explanation works best when applied in Michigan and other cold winter states.  

Why Design Build Works Well for Healthcare Practices

 
In this blog, I’ll explore how the Design-Build (D-B)method of construction is well suited to healthcare practitioners, more so than general construction.  To start, the D-B method was really created to suit the needs of busy business owners, including doctors, because it requires less attention from an owner and that owner can set their building involvement as much or little as they see fit.  Some customers like to be more engaged in the process than others and we are happy to accommodate each client’s unique desires.

 

The basic difference of D-B over general construction is the relationship between the architect and builder.  In this project delivery, they are on the same team. A doctor only needs to work with one entity to design and then build his or her office.  Also in this scenario, the doctor is protected from any discrepancies from the architect’s drawings to contractor’s construction application.  With D-B, the contractor and architect are consulting on budget, application, and material quality throughout design, so when construction starts there are very little interruptions or change orders. Should there be a discrepancy, the Design-Builder will work it out without involving the owner unnecessarily. This protection is valued by doctors who oftentimes aren’t as familiar with construction, nor have the time to deal with these issues on site. All of these reasons are exactly why D-B was created as an alternative to general construction.

Popularity Increasing for Design Build Construction

As an update to this blog originally posted a few years ago, we have new information to add  from the June 2018 Design-Build Utilization Report funded by Design-Build Institute of America. Findings in this report determined that popularity continues to grow for this delivery method. The results showed, "Design-Build Construction spending in the assessed segments is anticipated to increase 18% from 2018 - 2021", and will likely represent 44% of construction spending by 2021. Researchers determined that the education of building owners on Design-Build benefits is gaining traction, and more owners are experiencing enjoying the benefits first hand.  Additionally, FMI Corporation, a management consulting and investment company, had released a report in March 2019 titled 2019 AGC/FMI Risk Management Survey, whereby they found that "38% of contractors were <planning> to increase their in-house design capabilities last year and 43% this year".  So there will be more collaboration, less risk, and more competition among design and construction moving forward.

Original blog article:

According to the May 2013, “Design-Build Project Delivery Market Share and Market Size Report” by Reed Construction Data and RS Means Intelligence, Design-Build construction delivery method has taken an additional 9% of the construction market since 2005 and General Construction has lost 10% of the market share in that same time.