The Best Method to Build Light Commercial & Light Industrial Buildings

Light Commercial Buildings include (but aren’t limited to) medical practices, dental practices, office buildings, restaurants, banks, auto dealerships, and generally any building that is 25,000 s.f. or less and used for commercial business.

How to Design an Office for Patient Centered Medical Home

Since the Patient Centered Medical Home (PCMH) is more of a management model or philosophy, you may not have considered the building design changes that may be necessary to make the conversion.  Below we discuss some of the elements that your PCMH office design should consider.

You Have Construction Service Options

Which construction delivery system is best for your project?


There are several unique and distinctive methods for providing construction solutions. As a business owner you have the luxury of selecting the most beneficial and appropriate delivery system for your type of project.

Certificate of Need and Your Design Build Contractor

Updated 11/24/20: The controversial Certificate of Need (CON) program in Michigan is in question through several new bills that passed the Michigan Senate in February 2020.  It has yet to be decided in the House.  The debate has been ongoing and seems to be getting more and more heated with those against it arguing for an open market approach to drive down cost and those for it are claiming that the medical industry needs to be regulated to keep a high standard of care at an affordable cost.

Repurpose Your Commercial Office to Be More Modern

 

What Ideas Will Work for You?

Appearance is one of the triggers that leads to remodeling, but isn’t the only good reason to remodel.  Other reasons like efficiency, reorganizing unused space, right-sizing, and new technology can make a big difference in attracting or retaining talent, saving money and improving productivity.  Furthermore, modern designs that are created with goals of safety, appearance, efficiency, and increased focus or productivity can help you to make your space more useful for staff and enticing to clients.

Knowing Long Lead Items Early Speeds up Construction Schedules

Certain building materials or products that have to be ordered, imported, and/or manufactured specifically for a building can take longer than the natural progression of a construction schedule.  These are considered Long Lead Items (LLIs).  They commonly occur with pre-engineered buildings, elevators, generators, mechanical equipment that is heavy enough to need a helicopter lift, electrical switch gear, fancy finishes, or imported products to name a few.

A Guide to Relocating Your Business When the Time Is Right

In “Five of the Best Reasons for a Commercial Renovation”, I discussed why you should remodel now if you plan to stay at your current location.  In this blog, I offer tips on relocating your business/practice because your current location or building is no longer feasible to use.  Note:  if you own your existing space, it’s best to consult with your real estate agent to discuss the options regarding selling/renting your building.

4 Reasons Why the Preconstruction Phase Is Key to Project Success

For both Design-Build and Construction Management delivery methods, the start of Preconstruction Phase is Architectural Design and it’s a very exciting time for most building owners.  They love the ideas, options, and decorating aspects for their building.  And then, when drawings are done, the owner is eager to get to the other main event of Construction Phase.  But there is so much more happening during Design than they know and a lot more to be done before this Preconstruction Phase, “Pre-Con”, is complete.  This is also when the contractor gets organized to save the most time and money during construction.   

The Benefit of Design Build Phase I Drawings

Preliminary plans, such as those provided in a Phase I of the Design-Build process, are the most efficient and economical means to determine the budget for your construction project.

Flexible Finish Substitutions Can Improve Construction Time & Budget

Architects and engineers are smart people who are dedicated to taking the information their clients provide them and designing an aesthetically pleasing and functional building to meet their client’s goals.  In their design specifications, they include specific products for building finishes, which they’ve researched or have experienced, to match the desired outcome expressed by their client.  Typically, these materials or products have also been discussed with and accepted by the client.